Daris 3A5

About the Project

The Daris 3A5 prospect is located approximately 10 km northwest of Daris East within Block 7. Between 2010 and 2011, Alara conducted exploration programs and drilled 10 holes at the prospect, confirming the presence of high-grade copper-gold mineralization. Significant intersections are summarized in the accompanying table, with drill hole locations shown in the corresponding figure.

A mining license covering an area of 0.65 km² has now been granted over the prospect, paving the way for the next stage of development activities.

Project Detail Information
Commenced
2025
JV Company
Daris Resources LLC (DRL)
Alara’s Interest in JV
50%, with an option to increase to 70%
Commodities
Copper, Gold
Mining License
0.653 km²
Project Stage
Evaluation, Design and Construction
Shareholders in DRL
Alara Oman Operations Pty Ltd (50%), Al Tamman Trading & Establishment LLC (50%)