Block 7

About the Project

Block 7 is located less than an hour’s drive west of Muscat and is accessible via the Muscat–Sohar Highway up to Mulladda, followed by a 25-kilometre drive south along the paved Rustaq Road to the village of Al Hazm.

In 2013, Alara submitted mining license applications for two highly prospective copper-gold zones—Daris East and Daris 3A5—following extensive exploration activities conducted in Block 7 between 2010 and 2012, including

  • 1,200-line kilometres of helicopter-borne electromagnetic (VTEM) surveys,
  • 163-line kilometres of ground magnetic surveys, and
  • 20-line kilometres of ground IP and EM surveys
  • 67,66 meters drilling in 78 holes for various purposes in Block 7

These exploration campaigns led to the definition of a copper-gold resource at Daris East and confirmed the presence of high-grade copper mineralization at the Daris 3A5 prospect.

Project Detail Information
Commenced
2010
JV Company
Daris Resources LLC (DRL)
Alara’s Interest in JV
50%, with an option to increase to 70%
Commodities
Copper, Gold
Exploration License
Block 7; 587 km² / Under Renewal
Mining License
0.653 km² over Daris 3A5 prospect granted in 21st July 2025; Daris East application (3.2 km²) is in process of being granted
Project Stage
Advance Exploration, Evaluation
Shareholders in DRL
Alara Oman Operations Pty Ltd (50%), Al Tamman Trading & Establishment LLC (50%)